fbpx
We've closed the online store temporarily while we investigate some website issues. Sorry for any inconvenience. Please Email info@wjdflooring.co.uk for more infomation.

We've closed the online store temporarily whilst we investigate some site issues. Thank you for your patience and apologies for any inconvenience.

Fball Stopgap 800 25kg Bag Self Levelling Screed

£61.42 per m2 (incl. VAT)

Fball Stopgap 800 25kg Bag is a self levelling compound and is one of the sub-floor preparation products. This floor screed is a versatile smoothing compound for levelling uneven floors before laying decorative floor coverings. Fball Stopgap 800 25kg Bag self levelling screed is suitable for use over most substrates and adhesive residues.

SKU: 12534 Categories: , , Tag:

Description

Fball Stopgap 800 25kg Bag is a self levelling compound and is one of the sub-floor preparation products. This floor screed is a versatile smoothing compound for levelling uneven floors before laying decorative floor coverings. Fball Stopgap 800 25kg Bag self levelling screed is suitable for use over most substrates and adhesive residues. STOPGAP 800 is a self-levelling commercial and industrial grade floor compound STOPGAP 800 is for application over a wide range of subfloor types including used for upgrading and renovating new and existing internal floors in light to heavy duty applications where floorcoverings are not for use in areas such as storerooms, post rooms, workshops, corridors, warehouses nrequired to be installed. It is suitablensand / cement screed, concrete, granolithic, terrazzo, epoxy and polyurethane resins nand STOPGAP waterproof surface membranes.Floor surfaces must be suitably prepared: sound, dry (<75%RH) and free from contaminants that nmay prevent adhesion. Use STYCCOCLEAN C140 for removing grease, oil, polish soap etc. from nnon-absorbent substrates.nConcrete and sand/cement screeds must be fully cured and any laitance or surface treatments nmust be removed.The temperature of the floor must be maintained above 10°C throughout nthe application and drying of the compound. Underfloor heating must be off for at least 48 nhours before, during and after application. For detailed information, request the F. Ball Subfloor nPreparation Guide.

Enquire about this product

Please fill out the form below and a member of our team will get back to you.



    By Checking this box you understand that your details will be emailed to the relevant people to deal with your request and may be stored on our website for reference purposes. Please see our Privacy Policy for more information.

    Call Now Button